About Project
Full Mission Ship Simulation Navigation Study for Handling of Larger Container Vessels to Visakha Container Terminal Outer Harbour and Baby Capes Size Vessels to Inner Harbour Berths of Visakhapatnam Port
Trivandrum 695010
Monday to Friday
Full Mission Ship Simulation Navigation Study for Handling of Larger Container Vessels to Visakha Container Terminal Outer Harbour and Baby Capes Size Vessels to Inner Harbour Berths of Visakhapatnam Port
The objective and scope of work was to prepare and analyse the data for conducting Full Mission simulation navigation study and identify potential concerns, if any, on the approaches to berth and un-berth the largest designed container vessel to the existing and proposed extension of Visakha Container Terminal berths (VCTPL-1 and VCTPL-2) situated in the Outer Harbour and the feasibility of handling baby cape bulk carrier into the Inner Harbour, Northern Arm berths (WQ-7) of Visakhapatnam Port.
Force Technology Maritime Simulation Services Pte Ltd (FT) Singapore