RRD Building Sasthamangalam

Trivandrum 695010

9:00 AM - 6:00 PM

Monday to Friday

Modelling Study for Kerala Waterway between Chittari and Neeleswaram Rivers

About Project

Hydrographic Survey and Modelling study for the assessment of afflux and sedimentation to post construction of regulator /weir across the proposed waterway from Neeleswaram river to Chittari River

Project Info

  • Location : Kerala

Approach


Task No Description
1. Hydrography Survey of Rivers
2.  Hydrological analysis of catchments
3. Rainfall Runoff Modelling using NAM model
4. Set up of baseline 1D Hydraulic Model for water availability studies
5.  Scenario runs 

  1. With canal
  2. With proposed flow control structure
6. Flood modelling post construction of weir/regulator
7. Siltation studies in the river stretches post construction of weir/regulator

 

Client


KITCO Ltd.